Welcome to Parts Super Center! 

Whether you are a current customer or brand new to PSC, 

please make sure you create an account in order to receive account-specific pricing 

and other features not available to guests.


For emergency/after hours assistance, please call 800-243-2124.

Resources

Find news, product information and blogs here.

Filter Resource By:
How to find: switchgear summary number & breaker serial number
Tags
  • how to
  • serial number
  • summary number
  • switchgear
How to find: switchgear summary number & breaker serial number

Find out where the summary number & serial number are located. 

READ MORE
Service Advisory for GE ML32 and VR1 Voltage Regulators
Tags
  • Instructions
  • service advisory
Service Advisory for GE ML32 and VR1 Voltage Regulators

PSC instructions on how to service your voltage regulator contacts

READ MORE
The Actual Cost of Unplanned Downtime
The Actual Cost of Unplanned Downtime

Be preventative not reactive with your maintenance! 

READ MORE
Join PSC at EASA in Las Vegas
Tags
  • Motors
  • News
  • Trade Shows
Join PSC at EASA in Las Vegas

Stop by booth #421 to speak with our motors team.

READ MORE
Quick Guide: Replacing DC Contactor Arc Chutes and Coils
Tags
  • Documents
  • Drives and Controls
  • Instructions
Quick Guide: Replacing DC Contactor Arc Chutes and Coils

A quick, easy to follow guide on replacing arc chutes and coils for DC contactors. An excerpt from GEK-83756.

READ MORE
Case Study: Replacement Transformer for Chief Ethanol Fuel, Inc.
Tags
  • Case Study
  • Transformers
Case Study: Replacement Transformer for Chief Ethanol Fuel, Inc.

Parts Super Center worked with Chief Ethanol Fuels, Inc. to save them $50K in downtime and help them achieve 233% ROI on a replacement transformer unit.

READ MORE
Troubleshooting Guide: Transformers
Tags
  • Documents
  • Transformers
  • Troubleshooting
Troubleshooting Guide: Transformers

When your transformer isn't performing at optimal potential, it can be challenging to pinpoint the issue. Our troubleshooting guide covers the most common issues with transformers, as well as the suggested solution.

READ MORE
Replacing Secondary Electrical Substation Transformers
Tags
  • Documents
  • Transformers
  • White Paper
Replacing Secondary Electrical Substation Transformers

Transformers originally built in the second half of the 20th century are now nearing or past their designed life expectancy. Typical cycle time, from quotation to fulfillment, is 20 weeks.  It is imperative that industries review their installed base to identify transformers at risk and prepare in advance to avoid significant financial loss from downtime during the lead time.

READ MORE
PSC relocates to accommodate growth plans
Tags
  • News
PSC relocates to accommodate growth plans

The decision to consolidate and move was made with the customer in mind. With all operations in one facility, there is more opportunity to improve efficiencies and the additional office and warehouse space will accommodate planned growth initiatives over the coming years.

READ MORE
1 - 9 of 10 items
1 - 9 of 10 items