Welcome to Parts Super Center!

Resources & News

Find news, product information and articles here.

Filter Resource By:
The Calm Before the Storm - How to Properly Prepare for an Outage
Tags
  • Planned outages
  • technical help
  • Unplanned outages
The Calm Before the Storm - How to Properly Prepare for an Outage

Parts Super Center's technical experts can help you prevent your next unplanned outage.

READ MORE
How Can I Find My Summary & Breaker Serial Number?
Tags
  • how to
  • serial number
  • summary number
  • switchgear
How Can I Find My Summary & Breaker Serial Number?

Find out where you can locate your switchgear summary number & breaker serial number from one of Parts Super Center's technical experts.

READ MORE
Service Advisory For GE ML32 and VR1 Voltage Regulators
Tags
  • Instructions
  • service advisory
Service Advisory For GE ML32 and VR1 Voltage Regulators

PSC instructions on how to service your voltage regulator contacts

READ MORE
The Actual Cost of Unplanned Downtime
The Actual Cost of Unplanned Downtime

Be preventative not reactive with your maintenance! 

READ MORE
Join PSC at EASA in Las Vegas
Tags
  • Motors
  • News
  • Trade Shows
Join PSC at EASA in Las Vegas

The Parts Super Center Team will be at EASA in Las Vegas - make sure to stop by.

READ MORE
Quick Guide: Replacing DC Contactor Arc Chutes and Coils
Tags
  • Documents
  • Drives and Controls
  • Instructions
Quick Guide: Replacing DC Contactor Arc Chutes and Coils

A quick, easy to follow guide on replacing arc chutes and coils for DC contactors. An excerpt from GEK-83756.

READ MORE
Case Study: Replacement Transformer for Chief Ethanol Fuel, Inc.
Tags
  • Case Study
  • Transformers
Case Study: Replacement Transformer for Chief Ethanol Fuel, Inc.

Parts Super Center worked with Chief Ethanol Fuels, Inc. to save them $50K in downtime and help them achieve 233% ROI on a replacement transformer unit.

READ MORE
Troubleshooting Guide: Transformers
Tags
  • Documents
  • Transformers
  • Troubleshooting
Troubleshooting Guide: Transformers

When your transformer isn't performing at optimal potential, it can be challenging to pinpoint the issue. Our troubleshooting guide covers the most common issues with transformers, as well as the suggested solution.

READ MORE
Replacing Secondary Electrical Substation Transformers
Tags
  • Documents
  • Transformers
  • White Paper
Replacing Secondary Electrical Substation Transformers

Transformers originally built in the second half of the 20th century are now nearing or past their designed life expectancy. Typical cycle time, from quotation to fulfillment, is 20 weeks.  It is imperative that industries review their installed base to identify transformers at risk and prepare in advance to avoid significant financial loss from downtime during the lead time.

READ MORE
19 - 27 of 28 items
19 - 27 of 28 items